Discover our various projects completed with excellence
Türkiye
Our company provided air conditioning sales, installation and service for Şok Markets, which are located in all 81 provinces of Turkey and have over 10,000 stores.
Üsküdar, İstanbul
All mechanical installation works of the structure consisting of 10 villas and social facilities located in Üsküdar Çamlıca were successfully completed by our company.
Sivas, Lüleburgaz, Hendek ve İstanbul
The mechanical installation works of Tarım Kredi Market's warehouses in Sivas, Lüleburgaz, Hendek and Europe were successfully completed by our company.
Çengelköy, İstanbul
All mechanical installation works of the villa located in Üsküdar Çengelköy were successfully completed by our company.
Afyonkarahisar
All mechanical installation works of the dormitory and conference halls with a building area of 6,500 m² and a capacity of 284 students located in Afyonkarahisar were successfully completed by our company.
Sultanbeyli, İstanbul
All mechanical installation works of the structure consisting of 220 residences and 57 commercial units located in Sultanbeyli, Istanbul were successfully completed by our company.
Bayrampaşa, İstanbul
Fire protection systems, heating and cooling systems, and mechanical installation works of the central building with 10,000 m² of closed area belonging to Channel 7 media group were successfully completed by our company.
Ümraniye, İstanbul
The mechanical installation works of the administrative building with a construction area of 25,000 m² belonging to the TAFF Group were successfully completed by our company.
Tuzla, İstanbul
All of the cogeneration, HVAC systems, fire protection systems, oxygen system and mechanical installation works of the state hospital with 400 beds built on an area of 65,000 m² in Tuzla, Istanbul were successfully completed by our company.
Mısır
The industrial mechanical installation, HVAC Systems, and mechanical installation works of Hayat Kimya's hygiene factory with 35,000 m² of closed area in Egypt were successfully completed by our company.
Cezayir
The industrial mechanical installation, automation and mechanical installation works of one production line of Hayat Kimya's hygiene factory in Algeria were successfully completed by our company.
Pakistan
The industrial mechanical installation, fire tanks, HVAC Systems, automation and mechanical installation works of Hayat Kimya's hygiene factory with 45,000 m² of closed area in Pakistan were successfully completed by our company.
The industrial mechanical installation, raw material silo manufacturing, HVAC Systems, automation and mechanical installation works of Hayat Kimya's polyethylene factory with 55,000 m² of closed area in Egypt were successfully completed by our company.
The mechanical installation works of Ramada Encore Hotel in Bayrampaşa, Istanbul, which has 130 rooms and meeting halls, were successfully completed by our company.
Altunizade, İstanbul
The mechanical installation works of the 76-room hotel and social facilities with an area of 5,544 m² located in Altunizade were successfully completed by our company.
All mechanical installation works of the private hospital with 70 beds in Üsküdar Selimiye were successfully completed by our company. All mechanical installation works of the private hospital with 158 beds in Sancaktepe were successfully completed by our company.
Gazi Osmanpaşa, İstanbul
The mechanical installation works of the municipality building, district sports hall and police station building belonging to Gaziosmanpaşa Municipality were successfully completed by our company.
Pendik, İstanbul
The mechanical installation works of the shopping center built on an area of 11,000 m² in Pendik were successfully completed by our company.
Afganistan
The mechanical installation works of the military communication center built by NATO in Afghanistan were successfully completed by our company.
The project built by Bilgen Construction includes 5 blocks and 244 apartments. The mechanical installation works of these structures were successfully completed by our company.
All mechanical installation works of the old building of Ümraniye Municipality located in Santral were successfully completed by our company.
Kartal, İstanbul
Koçtaş is a shopping mall with an area of 10,000 m² in Kartal, Istanbul. The mechanical installation works of this area were successfully completed by our company.
Eskişehir
The mechanical installation works of the management buildings and social facilities of ESKİŞEHİR Kırka Boron Operation Directorate were successfully completed by our company.
İstanbul
The mechanical installation works of Turkish Airlines' ticket sales offices throughout Turkey were successfully completed by our company.
Çekmeköy, İstanbul
The project built by Sinpaş Inc. includes 169 residences and 11 commercial sections. The mechanical installation works of these structures were successfully completed by our company.
The project built by Sinpaş Inc. includes 20 blocks and 386 apartments. The mechanical installation works of these structures were successfully completed by our company.
The project built by Sinpaş Inc. includes a total of 326 residences, consisting of 192 residence apartments and 124 villas. All mechanical installation works of these structures were successfully completed by our company.
The project built by Sinpaş Inc. includes a total of 480 residences. All mechanical installation works of these structures were successfully completed by our company.
All planning and mechanical installation works of the stores and factories located in various cities of Turkey were successfully completed by our company.
All mechanical installation works of the project consisting of 14 apartments and 3,000 m² of commercial area built within Özkartallar were successfully completed by our company.
Acıbadem, İstanbul
All mechanical installation works of the complex with a construction area of 85,692 m², consisting of 410 apartments and social facilities located in Halkalı, Istanbul were successfully completed by our company.
The mechanical installation works of the buildings belonging to Kültür preparatory courses throughout Istanbul were successfully completed by our company.
Konya
The mechanical installation works of 70 shops located in Meram district of Konya were successfully completed by our company.
The mechanical installation application works of the patient rooms, laboratories and polyclinics in the 3,000 m² closed area of Kartal State Hospital undergoing partial renovation were successfully completed by our company.
Küçükyalı, İstanbul
The mechanical installation works of the management buildings and social housing belonging to Highways located in Küçükyalı were successfully completed by our company.
All mechanical installation works of the 76 rooms and social facilities with a usage area of 4,700 m² were successfully completed by our company.
The mechanical installation works of the administrative buildings located in Istanbul were successfully completed by our company.
The mechanical installation works of the operating rooms, patient rooms, laboratory and administrative offices within the hospital were successfully completed by our company.
The implementation of fermentation cold room and various mechanical installation works in the 11,363 m² closed area of Public Bread Factories within Istanbul Metropolitan Municipality was successfully completed by our company.
Bahçelievler, İstanbul
In this project, the mechanical installation works of the restaurant with a usage area of 2,500 m² were successfully completed by our company.
Bostancı/Beykoz/Üsküdar, İstanbul
The mechanical installation works of Doğa Schools' Bostancı, Beykoz and Üsküdar campuses with a usage area of 22,000 m² were successfully completed by our company.
İkitelli, İstanbul
Sinpaş Deposite, built on an area of 65,000 m², is planned as a mall, warehouse and office space. All mechanical installation works of this space were successfully completed by our company.
Turkuaz Konakları consists of 24 independent villas located on a 24,000 m² plot in Çekmeköy. All mechanical installation works of this project were successfully completed by our company.
In this project, we completed all mechanical installation works of the 55,000 m² warehouse area completely and to high standards. Fire safety systems, ventilation systems and industrial mechanical installations were successfully implemented by our company in accordance with project requirements.
Sancaktepe, İstanbul
In this project, we completed all mechanical installation works of the space with 15,000 m² storage area completely and to high standards. Fire safety systems, ventilation systems and industrial mechanical installations were successfully implemented by our company in accordance with project requirements.
All mechanical installation works of the space with a usage area of 3,000 m² used by Çağrı Food as management and office building were successfully completed by our company.
All mechanical installation works of the 78-store chain opened within Çağrı Food were successfully completed by our company.
The mechanical installation works of the space with 30,000 m² factory area and 2,500 m² administrative area, used as production and logistics warehouse, were successfully completed by our company.
Nişantaşı, İstanbul
The mechanical installation works of City's Mall with an area of 58,000 m² were successfully completed by our company.
Avcılar, İstanbul
The mechanical installation works of the project consisting of 34 villas and 309 apartments were successfully completed by our company.
In this project, the mechanical installation works of various stores and factories throughout Turkey were meticulously and successfully completed.